Recap of launch day.
One year and one week since haul out:
The cover comes off of what is left of the frame:
Frame is disassembled and piled up:
Bob and Joan rig and prep the masts for transport:
The masts were wrapped up perfectly:
The truck arrives and works its way under our boat:
Main mast up and over:
Pop:
We’re moving:
Turning the corner to the waterfront:
Preparing to lift the masts into place:
Installing spreaders:
“Mizzen” the dog:
Up goes the main mast:
Prepping the mizzen mast:
Up goes the mizzen mast:
Connecting the two masts together:
Time to get wet:
Checking for leaks (none):
We’re in the water:
Dockside:
Tanya’s brother and niece:
“Rail, hold me up”
Resting on the mooring:
We are taking a few days off (sort of) and then we’ll be back at it getting the boat ready to set sail again!
Thanks to all for the help!!!









































3 Responses to Recap of Launch Day